Login

Wind Farm History Information

Below is a list of the windfarm or related planning application details (past and present), in and around the Douglas Valley.
 
Penbreck & Carmacoup Forest Near Glespin Formation of windfarm
FINAL DECISION 17-01-2001
Application Refused
 
Penbreck & Carmacoup Forest Near Douglas Erection of 9 wind turbines and associated infrastructure
REGISTERED16-12-2008
 
Land east of Nutberry Hill, Cumberhead Forrest Complex approx 7km South of Lesmahagow, known as Nutberry Wind Farm Erection and operation of windfarm (21 turbines) and associated infrastructure, including access tracks, control building and monitoring mast
WITHDRAWN 11-10-2005
Withdrawn Decision
 
Land at Hagshaw Hill Near Douglas Erection and operation of windfarm (20 turbines) and associated infrastructure, including control building and extension to existing operations compound
FINAL DECISION 11-01-2005
Application Granted
 
Wind Farm at Limmer Hill Near Rigside Erection and operation of windfarm (consultation from Scottish Executive under S.36 of the Electricity Act 1989)
FINAL DECISION 23-08-2005
Application Refused
 
Spireslack Windfarm near Muirkirk and Douglas Erection and operation of windfarm (consultation from Scottish Executive under S36 of the Electricity Act 1989)
WITHDRAWN 04-05-2005
Withdrawn Decision
 
Area to front of yard at 1 Powell Street Douglas Water ML11 9PP Installation of 17.8 metre high wind turbine
FINAL DECISION 20-09-2006
Application Granted
 
Land east of Nutberry Hill Cumberhead Forest Complex Approximately 7km South of Lesmahagow, know as Nutberry Wind Farm Erection and operation of windfarm (6 turbines) and associated infrastructure, including access tracks, control building and monitoring mast
APPEAL DECIDED 28-09-2006
Application Refused
 
Andershaw Forest South of Douglas ML11 0SQ Erection and operation of 14 wind turbines, site control building, siting of meteorological mast, formation of access tracks and ancillary infrastructure APPLICATION LOGGED IN ERROR - NOW WITHDRAWN BUT ALL DETAILS LOGGED IN CL/07/0454
WITHDRAWN 03-07-2007
Withdrawn Decision
 
Galawhistle Wind Farm near Douglas Section 36 Consultation from the Scottish Government relating to proposed windfarm (55MW) consisting of 22 turbines, control building, access tracks, anemometer and associated infrastructure
REGISTERED 06-04-2010
 
Newtonhead Farm Ayr Road Rigside Erection of wind turbine and temporary crane platform (48m in height to blade tip)
REGISTERED 09-06-2011
 
Land adjacent to Wolfcrooks Farm Cottage Muirhead Douglas ML11 9PA Erection of windturbine 27.05m to tip
FINAL DECISION 08-08-2011
Application Granted
 
Land at Broken Cross, South Lanarkshire Erection of 80 metre meterological mast for a temporary period of 12 months
REGISTERED 04-10-2011
 
Land at Poniel, South Lanarkshire Erection of 80 metre meterological mast for a temporary period of 12 months
 
Land at Dalquhandy, South Lanarkshire Erection of 80 metre meterological mast for a temporary period of 12 months
REGISTERED 04-10-2011